
Effective Leak Detection And Repair (LDAR) for Genel Energy in Iraq
Effective Leak Detection And Repair (LDAR) for Genel Energy in Iraq
Genel Energy's Sarta facility in Kurdistan, Iraq is a new installation and was only brought into production in November 2020. In this case study, we share more about the Leak Detection And Repair (LDAR) campaign we executed for our new client.
Effective LDAR
Read the case study and discover:
- why they decided to work with us
- why do they measure fugitive emissions in a new facility
- the scope of work and used measurement techniques
- their impressions of our emission report
Read the case study
Download the case study here.
Related content

How Robotics Is Transforming the Inspection of Difficult-to-Inspect Pipelines
In a recent episode of the Pipeline Things podcast, our CEO Rienk de Vries joined hosts Rhett Dotson and Christopher DeLeon shortly after the Pipeline Pigging and Integrity Management Conference (PPIM) 2026 to discuss how robotics is pushing the boundaries of inline inspection (ILI), the evolution of robotic inspection tools, collaboration with operators, and the future of pipeline integrity technology.

40 Years at Intero – A conversation across generations
When one of our newer, already experienced operator, Jarno Heerkes, joins veteran Hendrik Lether at Intero’s Hoogeveen office, a conversation unfolds - full of stories, realism, and wisdom.
This year, Hendrik celebrates his 40th anniversary, a milestone that reflects not only his personal journey but also the remarkable growth of Intero itself. Later this year, Hendrik will retire, marking the end of an exceptional chapter.
