How Intero inspected an unpiggable 30" offshore flare line with custom turnkey approach

Highlight

“This was the first time we could accurately assess the condition and remaining life of our offshore flare line within shutdown and under budget.” - Asset Integrity Manager, Offshore Operator

Offshore 2

A 38,740 in / 984 m, 48-year-old offshore flare line that had never been pigged since its commissioning in 1971. The project required inspection during a scheduled shutdown, but offshore conditions added complexity: limited access, tight spaces, safety restrictions, and the need to coordinate flushing, cleaning, inspection, and dewatering within a short time frame. Efficiency, precision, and cost control were critical.