Case Study Antwerp Multi Diameter Pipeline

Case Study

How we delivered full UT ILI inspection on a 13.5 km Multi-Diameter Pipeline

Highlight

"Intero’s engineering-first approach helped us turn a legacy pipeline into a manageable asset." - Senior Integrity Manager, Confidential Client (Antwerp)

C0 A8795

Inspecting a 50-year-old, out-of-service ethylene pipeline with multiple diameter changes (4", 6", 8"), weld penetrations, and heavy-wall bends under the Schelde River.

Download the Case Study